Projects

 

 

 

 

 


 

 

 

Pool-bridge for the Langnese Summer-Club

The bridge consists of 206 different joints and 220 rods. Each rod and joint was individually manufactured and afterwards put together like a puzzle. Intentionally the looks of the bridge bear a certain randomness, this is, however, the result of strict precise system technology.

  (click on the pictures)
Span length: 14m
Load capacity: 15t on a area of 30 m2
Site: Isla Cristina, Spain
Construction time: 14 days with 3 men
Architect:
Christoph Tönges


The prefabricated parts are assembled at the construction site.




The finished girders are placed above the pool with a crane.





The proud architect and his building.






More pictures:

 

 

 

Corporate Information